Before install day
Customer Preparation Checklist
Use this list to get your property ready for delivery and installation. If anything here is a problem at your place, call us and we'll work through it with you.
Access for the delivery truck
- The delivery truck needs at least 13 feet of vertical clearance. Check for low tree limbs, power lines and structures along the way.
- The truck is about 28 feet long with a 10-foot boom. Make sure there's room to maneuver.
- Bridges, cattle guards, driveways and other access points must support up to 90,000 pounds.
- Tight spaces or sharp turns may prevent the shelter from being placed.
Your yard and work area
- For backyard installs inside city limits, two 10-foot fence panels must be removable for equipment access.
- The shelter weighs about 15,000 pounds, so the area around the dig needs room for the equipment to work safely.
Install day
- The excavator arrives about 90 minutes before the shelter is delivered to finish the dig.
- Typical installation time is less than four hours.
- Bad weather or heavy rain may delay delivery or installation.
Payment
- A 50% deposit secures your shelter and schedules your installation.
- The remaining balance is due on or before the scheduled delivery date.
Permits and after installation
- If you're inside city limits, check with your city to see whether a building permit is required.
- After installation, register your shelter's location with your local 911 service.
You can't rewind a storm
Be the house that's ready.
See your exact installed price in about a minute. Pick a shelter, type your address, and see one installed price.